Back to Bengaluru

Jayanagar Market Redevelopment Stalls as BDA and BSCC Weigh Future Plans

Jayanagar Market Redevelopment Stalls as BDA and BSCC Weigh Future Plans

The long-pending redevelopment of the Jayanagar market remains stalled midway, leaving the future of the commercial complex uncertain as civic authorities and local traders remain divided over its execution. The project was initiated after a fire accident in 2009, but work was halted after vendors refused to vacate shops in the old building.

Responding to a question raised by Jayanagar BJP MLA C.K. Ramamurthy during the Karnataka Legislature Session, Chief Minister D.K. Shivakumar, who holds charge of the Bangalore Development Authority (BDA), stated that the BDA and the Bengaluru South City Corporation (BSCC) must jointly decide on the future of the project. Shivakumar noted that the question of penalising the contractor for failing to finish the project does not arise because the existing shops were never vacated and handed over to the firm.

The BDA developed only one of the four proposed towers before stalling work and transferring the project to the newly formed BSCC. MLA Ramamurthy urged the government to redevelop the remaining three towers, suggesting options such as a Public Private Partnership if funds are constrained. He highlighted that abandoned sections of the fire-damaged market have become hubs for anti-social activities, including drug abuse and a past murder.

Local merchants have voiced significant dissatisfaction with the current setup. Jayaram B.K., a member of the Jayanagar Traders’ Association who lost his vegetable shop in the 2009 fire, noted that the new shop allotted to him on the first floor of tower one measures only 60 square feet, compared to his previous 140-square-foot space. He stated that business has dropped sharply and pointed out that upper floors remain empty, with the second floor closed, the third floor barricaded, and floors three to six entirely unoccupied. Traders have called for the old structure, which civic structural engineers deemed safe, to be renovated instead.

Meanwhile, BSCC Commissioner K.N. Ramesh said the corporation is moving to lease space on the third to sixth floors of tower one to private firms for office use. The civic body is also reviewing ongoing arbitration between the BDA and the previous contractor. Ramesh added that if alternative land sought in Banashankari remains unavailable, the BSCC may consider utilising the remaining Jayanagar market land to construct its own headquarters.

Share